This is an advance warning that in approximately 24 hours time, CF will have some scheduled downtime as we upgrade our current server cluster to an even larger private server network with with the addition of 4 new webservers.
The downtime will start on or about GMT 0500 on 30 October 2004 (Saturday morning) and last for 1-2 hours - ideally much less than that.
Bear in mind that due to potential unforeseen circumstances the downtime may be postponed till later - but I'm trying to make it happen as soon as possible.
After this upgrade CF should be okay for at least another 12 months I think. At the end of this, we will have 1 dedicated mail server, 1 dedicated DNS server, 1 dedicated IRC server, 1 dedicated load balancer, 1 dedicated image server, 4 dedicated Apache servers and 1 dedicated MySQL database server.
That's a LOT of servers.
Please pray for a smooth transition.
UPDATE: I've figured out a way to minimize downtime - there may be NO downtime at all, or possibly 1-2 hours at the most.
The downtime will start on or about GMT 0500 on 30 October 2004 (Saturday morning) and last for 1-2 hours - ideally much less than that.
Bear in mind that due to potential unforeseen circumstances the downtime may be postponed till later - but I'm trying to make it happen as soon as possible.
After this upgrade CF should be okay for at least another 12 months I think.
That's a LOT of servers.
Please pray for a smooth transition.
UPDATE: I've figured out a way to minimize downtime - there may be NO downtime at all, or possibly 1-2 hours at the most.