Huntington Ingalls’ CEO says the Navy will provide its first concrete design-schedule guidance for the BBG(X) “Trump-class” guided-missile battleship within 30–60 days, a key signal of whether the service adapts existing destroyer-era work or starts fresh. BBG(X) was unveiled Dec. 22, 2025, with USS Defiant (BBG-1) envisioned as the lead ship in a “Golden Fleet.”
-Early parameters point to an 840–880-foot, 35,000+-ton combatant with six-year design contracts, a likely early-2030s procurement window, and late-2030s/around-2040 entry into service.
The Navy’s own announcement described BBG (X) as the first battleship-type procurement since World War II and said that the ship will be a high-end, heavily armed surface combatant.